Home › Planning guide
In effect since 27 July 2026

The 45m² garden home planning exemption in Ireland, explained

Since 27 July 2026, you can build a permanent, detached home of 32–45m² in the rear garden of the house you own and live in, without a planning application, if every condition is met. This guide checks each condition against the regulation itself, and shows what still applies and what's only been announced.

A garden room pod being lifted by crane over a semi-detached house

Read this first. This guide is a plain-English summary to help you understand the shape of the rules. It is not legal or planning advice. Exemptions have conditions, and conditions have exceptions. Always confirm your specific situation with your local authority before spending money or starting work.

What the exemption actually allows

Since 27 July 2026, Irish homeowners have been able to build a permanent, detached, habitable dwelling in the rear garden of their main residence without going through a full planning application, provided it meets a specific set of conditions.

This is a genuine change. Previously, a habitable unit in your back garden almost always required planning permission, with the delay, cost and uncertainty that involves. The exemption removes that step for units that fit within defined limits.

The core conditions at a glance

ConditionRequirement
Floor areaBetween 32m² and 45m², measured as total internal floor area
LocationRear garden of your principal private residence
Owner-occupierThe main house must be the owner's sole or main residence when work starts
TypePermanent, detached dwelling
Height: tiled or slated pitched roofUp to 4 metres
Height: any other roofUp to 3 metres
Once onlyThe exemption can be used once. Ordinary sheds and garden rooms don't reduce the 45m² (Department clarification, 6 November 2026)
SetbackAt least 0.6m from any wall or party boundary, windows included
Private open spaceAt least 25m² must remain for the main house
ServicesNo separate utility connections, including water or wastewater
AccessIndependent pedestrian and/or wheelchair access within the property; no new vehicular or pedestrian access onto a road
Sale and lettingOccupied only in conjunction with the main house. Cannot be sold or subdivided separately. No short-term letting. Not available if the main house has been subdivided
Caravans & mobile homesExcluded: the structure must not be temporary in nature
Council notificationAt least 14 days before work starts, stating location, Eircode and purpose
Time windowMust be both commenced and completed between 27 July 2026 and 31 December 2030

The size limits, and why 32m² is the floor

The exemption applies to units between 32m² and 45m². The upper limit is the one everyone focuses on, but the lower limit matters too. A smaller unit doesn't automatically qualify simply by being smaller. If you're building something under 32m², you're likely looking at a different set of rules entirely, such as those covering garden rooms and home offices, which are not habitable dwellings.

To put 45m² in context: that's roughly the size of a modest one-bedroom apartment. Enough for a bedroom, bathroom, and a combined living and kitchen space. It's a real dwelling, not a shed with a bed in it.

Does an existing shed count toward the 45m²? Read on its own, condition 7 of Class 3A appears to add existing Class 3 structures, such as sheds and garden rooms, to the 45m². On 6 November 2026 the Department of Housing clarified that this reference should be read as Class 3A only: the exemption is meant to be used once, and an ordinary shed doesn't reduce the garden home's 45m². The Department also clarified that floor area means total internal floor area, that the main house doesn't have to be detached, and that at least 25m² of free garden space must remain whatever else is in the garden. The regulation's wording hasn't been changed. Read the clarification on Wicklow County Council's site, and confirm with your own council how it applies to your garden.

Caravans and mobile homes do not qualify. Class 3A requires a permanent structure; the construction must not be temporary in nature. A static caravan or mobile home sited in a rear garden is not an exempt development under these regulations, whatever its floor area. PodMove lists caravans and mobile homes because people buy and move them for many reasons; none of those reasons is this exemption.

Height limits: the detail that catches people out

There are two different height limits depending on your roof:

  • 4 metres if it has a tiled or slated pitched roof
  • 3 metres for any other roof type, including flat roofs

This matters more than it first appears, because many modern modular garden homes and pods are designed with flat or very shallow roofs for a contemporary look. That design choice drops your permitted height by a full metre. If you're comparing suppliers, ask what the finished height will be including the base it sits on. A unit that's 2.8m tall sitting on a 300mm base is 3.1m overall, and that's over the limit.

Boundaries, open space, access and ownership

Two conditions that rarely make the headlines but rule out plenty of gardens:

  • 0.6m setback. The structure must sit at least 0.6 metres from any wall or party boundary. Any windows must also be at least 0.6 metres from the boundary they face.
  • 25m² of private open space must remain for the main house. You cannot fill the garden.

There are further conditions on services: there can be no separate utility connections, including water or wastewater. Where a septic tank or other non-piped treatment system is in use, the structure cannot encroach on the approved percolation area, the system must have capacity for the extra load and comply with the EPA Code of Practice, and no extra treatment unit can be installed under this exemption.

Access matters too. The garden home needs its own pedestrian and/or wheelchair access within the property, and no new vehicular or pedestrian access onto a road can be created under the exemption.

It has to be your own home

The main house must be the owner's sole or main residence when work starts. The exemption isn't available where the main house has already been subdivided.

The 14-day notification: don't skip this

Exempt does not mean invisible. You must notify your local authority at least 14 days before work starts. This is not a planning application, and it isn't something they approve or refuse in the normal sense. It's a notification. But it is a requirement of the exemption, and skipping it undermines your position if a question arises later.

Practically: build the 14 days into your timeline. If your supplier has a delivery slot booked, work backwards from that date. Some suppliers will handle the notification paperwork for you. It's worth asking, because it's one less thing to get wrong.

What still applies: this is the big one

Building Regulations and Building Control Regulations still apply in full. The exemption removes the planning permission step. It does not remove your obligation to build to standard.

This is the single most misunderstood part of the new rules. "No planning permission required" gets read as "no rules apply", and that's wrong. Your garden home still needs to meet requirements covering structural safety, fire safety, insulation and energy performance, ventilation, and drainage.

In practice this means the cheapest possible unit is rarely the cheapest overall. A structure that isn't built to habitable standard may satisfy nobody: not Building Control, not your insurer, and not a future buyer of your house.

The 2030 deadline

The exemption is time-limited, and the wording matters: the development must be both commenced and completed between 27 July 2026 and 31 December 2030. A unit started in 2030 but finished in 2031 falls outside the exemption as drafted. That's a real window, not an open-ended right. Whether it gets extended is unknown, so plan on the rules as they stand.

The part nobody tells you about: getting it into the garden

Here's where most people get caught out, and it has nothing to do with planning.

Buying the unit is one job. Getting it into your back garden is a completely separate one, and often a harder one. A 45m² modular home is a large object. Your side passage is probably not wide enough for it.

There are three distinct services involved, and they are usually three separate hires from three different companies:

  • Delivery and transport: a haulier brings the unit to your property, usually dropping it at the gate or driveway. Often arranged through the seller. Getting it any further is not normally included.
  • Siting and placement: manoeuvring the unit into its final position on the base. Requires side access wide enough to physically get the unit through. The haulier may do this if access allows.
  • Crane hire and lifting: if there's no side access, you hire a crane firm separately to lift the unit over the house, wall or fence. This describes most urban and suburban gardens in Ireland.

Crane firms lift. They don't normally deliver. That's the single most common misunderstanding here. People assume booking a crane means the unit turns up too. It doesn't. You arrange transport, and you book the crane, and the two need to arrive on the same day.

Crane hire is not a trivial cost, and it's not something to discover on delivery day. Before you commit to buying, get someone to assess your access. A crane firm will usually do a site access assessment, and some suppliers include this.

And before any of that: the base

Your garden home needs something to sit on. The main options are a concrete slab, or ground screws: metal screws driven into the ground supporting a timber subframe.

Ground screws have become popular for garden buildings because they need very little site preparation, install quickly, work well on sloping or uneven ground, and can be adjusted to level. Concrete remains the more traditional choice and suits larger or heavier units. Which is right depends on your soil, slope, drainage and access, so a groundworks contractor should assess rather than assume.

Whatever you choose, the base needs to match the unit's footprint precisely and be ready before delivery day.

Find who supplies, delivers and sites them, by county. PodMove.ie lists Irish garden home suppliers alongside the hauliers, crane firms and groundworks contractors who deliver, lift and base them. Browse the directory or estimate your delivery and siting costs.

What does a 45m² garden home cost?

The unit itself varies too much by size, spec and supplier to give a fair range, so get quotes for it. The costs around it are easier to pin down, and they're the ones people forget to budget for.

CostTypical rangeSource
Concrete base€90–150 per m². A 32m² base comes to about €2,880–4,800; a 45m² base about €4,050–6,750Published rates, Summerhouse24.ie
Crane hire (no side access)€350–1,000 per day, depending on crane size, reach and lift timePublished rates, Kerwin Heavy Haulage
Delivery, siting, ground screws, connections, landscapingGet a quote. There's no reliable public pricing yet—

These are indicative figures only. Use the cost calculator to estimate the base and crane for your own unit and county, and see which parts still need a quote.

The order to do things in

  1. Check your garden actually works. Rear garden of your main residence, enough space, and, critically, think about access for delivery.
  2. Get an access assessment. Find out early whether you need a crane. It changes your budget significantly.
  3. Choose your unit. Confirm the finished height including base, and that it's built to habitable standard.
  4. Sort the base. Groundworks contractor, concrete or ground screws, sized to the unit's footprint.
  5. Notify the local authority. At least 14 days before work starts.
  6. Book delivery and siting. Coordinate so the base is ready before the unit arrives.

Common questions

Do I need planning permission for a 45m² garden home in Ireland?

Not if it meets every condition of the exemption: 32–45m², in the rear garden of the house you own and live in, within the height limits, with the local authority notified at least 14 days before work starts, and both commenced and completed before 31 December 2030. Outside those conditions, normal planning rules apply.

Can I rent it out?

Short-term letting is prohibited, and the garden home can't be sold or subdivided separately from the main house. It may only be occupied in conjunction with the main house. The regulations don't otherwise deal with longer-term renting. The Government said in April 2026 that it intended to allow private renting, with tenants outside the Residential Tenancies Acts, and that tax treatment such as Rent-a-Room relief would be considered later. Treat those points as unsettled and get legal and tax advice before letting it.

Does it still need to meet Building Regulations?

Yes, in full. The exemption removes the planning application, not the building standard. Structural, fire, insulation, ventilation and drainage requirements all still apply.

How much does it cost to crane a garden home over a house?

It varies widely with crane size, access, road closures and how long the lift takes. Our cost calculator gives a sourced range. Get quotes from crane firms directly, before you buy the unit rather than after.

What if I don't have side access?

Then you're almost certainly looking at a crane lift over the house or a boundary wall. This is common in Irish urban and suburban gardens, and it's the single biggest hidden cost in the whole project.

Can I build one under 32m²?

You can build smaller structures, but this specific exemption applies from 32m² upward. Smaller garden rooms and home offices fall under different rules and generally aren't habitable dwellings. Check which category yours falls into before proceeding.

Announced or under review, not yet law

Some things you may read about are statements of intent, not rules in force. As of this page's last review:

  • Private renting. The Government said in April 2026 that garden homes could be rented privately, outside the Residential Tenancies Acts. The regulations themselves only ban short-term letting and separate sale.
  • Tax relief. Bringing garden homes under Rent-a-Room relief was to be considered as part of Budget 2027. Check the current position with Revenue.
  • A review. The Government said the exemption would be reviewed within 18 months of coming into force. Conditions could change after that.

Where to check the rules yourself

Don't take this page as the final word. Verify against the source:

  • S.I. No. 340 of 2026: the Planning and Development (Exempted Development (Act of 2000)) (No. 3) Regulations 2026, signed 16 July 2026, in force from 27 July 2026. Class 3A is the garden home exemption. Many councils publish it, for example South Dublin County Council.
  • Department of Housing clarification on Class 3A, 6 November 2026: condition 7 (sheds, once only, internal floor area, 25m² of free garden space, detached house). Published on Wicklow County Council's exempted development page.
  • Your council's notification form: most councils publish a Class 1A / Class 3A notification form on their planning pages
  • Citizens Information: plain-English summaries of planning rules
  • Your local authority's planning department: the only place that can tell you how the rules apply to your specific site, and who you must notify anyway

Final word. Nothing on this page is legal, planning or financial advice. Rules change, and exemptions carry conditions that depend on your circumstances. Confirm everything with your local authority before committing money.

Garden homes & who delivers them, by county